Masdar – Shams 1 parabolic mirror concentrated solar power.
Operational since 2013 with 100 MW installed capacity.
Masdar Tribe – East Rockingham Waste to Energy – In Construction.
Processing 300k TPA of waste, generating 29MW electrical power, forecast operation 2022.
Masdar Tribe – Maryvale Energy from Waste – In development.
Phase 1 to process 325k TPA of waste, generating Steam for offtake by the adjacent OPAL Paper facility and up to 35MW electrical power.
Masdar – London Array offshore wind farm.
Operational since 2013 with 630MW installed capacity.
Masdar – Sharjah Waste to Energy – in Construction.
Processing 300k TPA of waste, generating 30MW electrical power, forecast operation 2022
Sustainable Energy Development
A strategic partnership between two pioneering sustainable energy developers, Masdar and Tribe Infrastructure, developing Clean Energy projects in Australia.

In November 2020, Masdar and Tribe strengthened their existing collaboration by establishing a joint venture to develop utility-scale renewable energy projects in Australia, the primary focus being energy-from-waste (EfW) projects.

Announced as part of the Australia UAE Business Council inauguration, the joint venture marks a defining step for Masdar – further establishing itself in the Australian market.

The Masdar Tribe Australia team are working on a portfolio of existing and pipeline projects across the country.

New Website Coming Soon